Analytics & Insights
Everything Lithora knows about how your team is working, in one hub — throughput and cycle time, capacity and cognitive load, time reports, and the agent's own read on where work is stuck.
Cycle time tracks how long work takes from start to done — the trend and target line surface in Velocity as data accrues.
Where to find it
Open Dashboard → Insights. The hub is a set of tabs; the Analytics tab renders inline, and the others open their dedicated page.
Analytics
The full analytics dashboard, rendered inline in the hub. Completion, throughput, and project health across your team.
Capacity
Cognitive-load scoring and workload distribution — the answer to "are we overloaded?"
Time
Time entries, weekly and monthly reports, productivity, and the CSV timesheet export.
AI
Project summaries and bottleneck detection from the agent — insight you can turn into work in one step.
Graph
The cross-surface memory graph and semantic search — the context the agent reads, made visible.
Advanced analytics requires Scale
Project health
Each project carries a health score from 0–100 combining four signals:
- Completion rate: How much of the project's work is done.
- Overdue work: Tasks past their due date that are not done.
- Velocity: Completed work measured against what is still open.
- Blockers: Blocked tasks apply a penalty to the score.
The score reads out as Excellent (80+), Good (60–79), At Risk (40–59), or Critical (below 40).
Capacity & cognitive load
Capacity scores your load from 0–100 out of four weighted components, then labels the result underutilized, optimal, high, or overloaded, with focus recommendations alongside it.
- Task load: Your open To Do and In Progress tasks, weighted by priority — an Urgent task counts far more than a Low one.
- Deadline pressure: Due dates landing within the next 48 hours. This component carries the heaviest weight.
- Meeting load: Hours of meetings scheduled today.
- Context switching: Distinct projects you have touched in the last four hours. One project is free; each additional one adds load.
Your score is yours
Related
- Time tracking — where the hours behind the Time tab come from.
- Memory graph — semantic search across the whole workspace.
- Sprint planner— turns velocity into the next sprint's capacity.